Ather Spare Parts List
Hello People. This article contains Ather Spare Parts List. Electric vehicle users will have to make a note on the spare parts of their electric vehicle.
SIDE STAND MAIN LINK
BRAKE LEVER LH
GRAB HANDLE
FLOOR SIDE PANEL LH
FAIRING LH
GRIP LH
Float panel RH
Front Shroud Visor Sub Assembly
Rearview Mirror Assembly,RH
Brake lever RH
Floor side panel RH
Cap,Floor side Cover,RH
Fairing RH
Panel,Tail Side,RH
Brake lever RH
Rearview Mirror Assembly,RH
Floor side panel RH
Floor Board
FLOATING PANEL,RH
FAIRINGRH
Start Switch Assembly
Throttle
REARVIEW MIRROR ASSEMBLY LH
FTSL LH
WHEEL WELL
CLIPON_ASSEMBLY RH
CLIPON_ASSEMBLY LH
GEN 1.5 BATTERY
FLOOR BOARD FOAM CENTER
SEAT LOCK
CHARGER SUB-ASSEMBLY_MBOM
BRAKE SUB-ASSEMBLY_MBOM
FRONT FORK SUB-ASSEMBLY_MBOM GEN 1.5
HEADSTOCK
FRONT WHEEL WITH STANTIONS S/A GEN 1.5
FRONT_FENDER
FLOATING PANEL,LH
FLOATING PANEL,RH
FAIRING LH
FAIRINGRH
S450 LOGO RH
S450 LOGO LH
HEADSTOCK COVER SUB-ASSEMBLY_MBOM
GRIPHANDLELH
THROTTLE
LEVER KIT
SIDE STAND SUB-ASSEMBLY_MBOM
CAP,FLOOR SIDE COVER,LH
FLOOR SIDE COVER,RH
FLOOR SIDE COVER,LH
SEAT ASSEMBLY_MBOM
PANEL,TAIL SIDE,LH
PANEL,TAIL SIDE,RH
Ather GREEN STRIPE LH
Ather GREEN STRIPE RH
GRAB HANDLE
FRONT SHROUD VISOR SUB ASSEMBLY _MBOM
FLOOR SIDE COVER,LH -BLACK
Cap,Floor side Cover,RH
GRAB HANDLE
FAIRING LH-BLACK
FLOATING PANEL LH-BLACK
BRAKE LEVER
STICKER FLOATIN PANEL LH CE
4G DONGLE CABLE RETROFIT
Front Shroud Visor Sub Assembly_FB
FTSL LH
FTSL RH
S450 LOGO LH
Master Cylinder LH
FLOATING PANEL LH_BK
FAIRING LH_BK
FLOOR SIDE COVER LH_BK
Front Shroud Visor Sub Assembly BK
Hope this article on Ather Spare Parts List is useful to you.
Are you looking to start your business in the electric vehicle industry? We provide software development, web application development, mobile application development, charging stations management app, electric vehicle fleet management software development, cyber security and all software services. Please check our home page here https://iwheels.co/
To setup charging stations in apartments, a Class A electrical contractor has to assess the load requirement. Based on the load requirement, the apartment association has to submit a letter to the area electricity power distribution office seeking approval for a new LT6 connection to set up the charging station. Please read in our blog page about TATA NEXON EV SPARE PARTS